Saturday, May 1, 2010

29 April 2010

I went to P/E Kedai 4 Tingkat, Simpang Jln. Naib Long, Tangkak. There wer 2 teams. They made a termination joint new cable to switch gear and also a straight through joint. The old cable were tested and a weak point that can cause a breakdown was found. That's why the new cable need to replace it.

A straight through joint.

The old cable.

They worked together to remove the old cable.






No comments:

Post a Comment