I followed En Aeiman and En Shariff to PMU Pagoh 132/11 kV. Actually, this team need to do preventive work at P/E Kg Batu 14. At the PMU, En Aeiman off the supply to the H. Poles. He used the remote in the control room to trip the supply. Then, he switched off the supply at the breaker that supply electricity to the transformer at P/E Kg Batu 14. En Aeiman also explained the connection and the different between PMU, SSU, substation and H Poles.