This week I was in the Construction Unit.

I followed En. Zabidi with his friends to P/E Lot 1467 Taman Setia Kasih . It was a new build substation. They joint cable to a switch gear and transformer. Some of used equipment were cable cutter, stress grading mastic and 11kV Phase Terminal Insulating Boot.