We went to Kawasan Perindustrian Bakri. The underground cable from a substation need to be replaced with a new one to avoid breakdown in the future. We checked the area to see how long overhead and underground cable that will be needed. We also need to estimate how much sand and tar needed so that we can estimate the budget for this project.